Process link
A set of Process link properties consists of process step properties and additionally:
Property
Description
Project
The name of the project containing the linked process (empty means current project)
Process
The name of the linked process
Entry point
The name of the entry point inside the linked process - this property is shown only if there are more than 1 entry to the process