Create Go to from Insert menu

To create a Go to step by specifying its destination select a Stop, Sink or Exit step and press the Go to button in the Insert group of the Home tab in the ribbon.

GotoButton

You can also select the existing Go to step if you want to change its destination.You will be warned if the currently selected step is of the wrong type. The following dialog appears:

 

CreateGotoDialog

 

The list of process steps that is shown contains all possible destinations. Since you cannot jump into a parallel branch the steps from such branches will be excluded. But, you can jump into a subprocess, so all steps from all lower level subprocesses will be included. However, this list will be totally different if you select a step ending a parallel branch. Now, you can jump inside another parallel branch but you cannot jump into a subprocess or in a choice's branch.

You can also start typing the name of the require destination in the search box above the process step list. The list will be automatically filtered while you type.

 

Select the required destination and press OK. The originally selected step will be converted to the Go to step with the selected destination.

 

Alternatives :

Right mouse click on the process step of the right type. A pop-up menu will appear. Select Insert and then Go to.